THE UPPER VOLUME RESTS ON THE LOWER ONE AND
ON A CONCRETE PIER TO FORM BOTH A BRIDGE AND
A CANTILEVER. THIS MASSING STRATEGY ALLOWS FOR
INCREASED ACCESS AND PERMEABILITY OF THE SITE AND
EMPHASIZES THE CHARGED RELATIONSHIP BETWEEN
THE BUILDING AND THE GROUND.