Archetech Issue 21 2015 | Page 83

The turnkey project comprised the full fit out of the South East wing on the second floor of the building. Work to the reception area included a combination of exceptionally high quality walnut, graphite and stone finishes. A bespoke feature desk of graphite and stainless steel was installed along with elevated ceiling sections with uplighters, an integrated media wall and natural stone porcelain floor tiles with Pantone branded mosaic insert tiles. Fittings and furniture include Senator work stations, Knoll seating booths, with integrated plug and play technology and varying work station heights, to increase vitality and promote collaborative working. A 30-metre feature ceiling raft also marks a centralised zone designed to change office dynamics, reflecting different levels and dimensions in the use of the open space. “We’re developing a strong reputation across the industry for our design work and this job perfectly illustrates what we do, reflecting the quality of our work and an attention to detail that reinforces the professionalism and high standards of our team. We’ve worked full-time, seven days a week, on this project to ensure all of the client’s needs have been met and we’re pleased to have fully delivered for this company.” Michael Page, joint managing director of Saracen Interiors www.saraceninteriors.com Page 83 - Archetech Client: Tata Communications Sector: Commercial Project: Design and full fit out Time: 12 weeks Location: North bank of the River Thames