ON THE PARKING LOT
Reduce Parking N
Lot Liability
Prepare your sealer
for cooler weather.
MARK MCLEOD
ow is the time when pave-
ment maintenance contrac-
tors should be reaching out to
property managers regarding
getting their parking lot mainte-
nance completed prior to winter!
Approach them with your program/
pricing for reducing their parking lot
liability. Potholes, cracks, sealcoating
and directional line marking are a
must prior to winter. Property man-
agers are now negotiating their snow
plowing and snow removal in the
northern sector of the USA, so send
out your maintenance solicitation
notices and deploy your sales staff
now to reach these managers about
getting this critical maintenance
Refurbished 2000-AS Palletized Striping Unit
Mounted to a 2003 Isuzu
Serial#: 1298
• 2003 Isuzu NPR, 109” WB, 5.7L V8 Gasoline Engine
• (2) 25 Gallon SS Paint Tanks with 10” Lids.
• (1) 300# CS Bead Tank with 10” Lid.
• All Stainless Steel Paint Plumbing.
• NEW 20 HP Honda Engine with Electric Start.
• NEW KC-78C Headset.
• Refurbished Atlas Copco Air Compressor.
• (3) KCN-015 Paint Guns—REBUILT.
• (3) KC-600 Pressure Bead Guns—REBUILT.
• (1) Refurbished M40D Skipline Controller.
• All NEW Solenoids.
• Rack and Pinion Steering.
• No Warranty on Isuzu Chassis
Visit us on the web: www.kellycreswell.com
[email protected]
For More Information On This Advertiser Please Visit www.CallAPE.com/e-inquiry
www.callape.com
For More Information On This Advertiser Please Visit www.CallAPE.com/e-inquiry
[20]
1.800.210.5923