APE APE September 2019 | Page 20

ON THE PARKING LOT Reduce Parking N Lot Liability Prepare your sealer for cooler weather. MARK MCLEOD ow is the time when pave- ment maintenance contrac- tors should be reaching out to property managers regarding getting their parking lot mainte- nance completed prior to winter! Approach them with your program/ pricing for reducing their parking lot liability. Potholes, cracks, sealcoating and directional line marking are a must prior to winter. Property man- agers are now negotiating their snow plowing and snow removal in the northern sector of the USA, so send out your maintenance solicitation notices and deploy your sales staff now to reach these managers about getting this critical maintenance Refurbished 2000-AS Palletized Striping Unit Mounted to a 2003 Isuzu Serial#: 1298 • 2003 Isuzu NPR, 109” WB, 5.7L V8 Gasoline Engine • (2) 25 Gallon SS Paint Tanks with 10” Lids. • (1) 300# CS Bead Tank with 10” Lid. • All Stainless Steel Paint Plumbing. • NEW 20 HP Honda Engine with Electric Start. • NEW KC-78C Headset. • Refurbished Atlas Copco Air Compressor. • (3) KCN-015 Paint Guns—REBUILT. • (3) KC-600 Pressure Bead Guns—REBUILT. • (1) Refurbished M40D Skipline Controller. • All NEW Solenoids. • Rack and Pinion Steering. • No Warranty on Isuzu Chassis Visit us on the web: www.kellycreswell.com [email protected] For More Information On This Advertiser Please Visit www.CallAPE.com/e-inquiry www.callape.com For More Information On This Advertiser Please Visit www.CallAPE.com/e-inquiry [20] 1.800.210.5923