APE APE July 2019 | Page 22

EXPERT ADVICE Properly Cleaning and Repairing Untreated Property Before Sealcoating ontractors understand the importance of following best practices when sealcoating a pavement lot or driveway. Many steps must be taken to assure the integrity of the process, and preparation begins long before any pavement coating is applied. The Pavement Coatings Technology Council (PCTC) recommends beginning by properly cleaning and re- pairing the asphalt surface. In doing so, contractors create condi- tions that will ultimately lay the foundation for a successful end product. Treating Wide Cracks Large cracks require the most time and attention when it comes to preparing pavement prior to your sealcoating job. If wide frac- tures, alligator cracking patterns, soft areas or sunken spots are discovered on the asphalt, contractors should repair or replace the pavement or base before coating is applied. This may result in extensive patchwork, which must be allowed 30-90 days to prop- erly cure. However, the number of days required for curing can vary depending on type of asphalt, aggregate, weather conditions For More Information On This Advertiser Please Visit www.CallAPE.com/e-inquiry www.callape.com [22] 1.800.210.5923