Analytics Magazine Analytics Magazine, January/February 2014 | Page 98

18. All times in the decision tree below are given in hours. What is the expected travel time (in hours) of the optimal (minimum travel time) decision? a) 7.8 b) 6.9 c) 7.4 d) 7.0 19. An analytics professional is responsible for maintaining a simulation model that estimates system throughput given different staffing levels required for a specific operational business process. Assuming that the operational team always uses the number of staff determined by the model, which of the following is the MOST important maintenance activity? a) Ensure that all of the model input data items are available when needed. b) Determine if there has been a change in model accuracy over time. c) Ensure that all users are reviewing the model results in a timely fashion. d) Determine that the model’s reports are understood by the users. 20. A segmentation of customers who shop at a retail store may be performed using which of the following methods? a) Monte Carlo Markov Chain and ANOVA b) Clustering, factor and control charts c) Decision tree and recursive function analyses d) Clustering and decision tree 21. In the diagram below, what is true of Strategy B compared to Strategy A? Cumulative Probability Curves NPV - Millions US$ cum. probability 1 0.9 0.8 Strategy A 0.7 Strategy B 0.6 0.5 0.4 0.3 0.2 0.1 0 (400) (200) - 200 400 600 NPV, Millions US$ 15 ® 800 1,000 1,200 1,400 1,600