ALDOT Statewide TSMO Program Plan ALDOT Statewide TSMO Program Plan 20190522REV | Page 41

The first step mentioned in the systems engineering process references regional architectures. This is a process by which existing systems are defined and interoperability relationships within an agency are identified. Recent upgrades and capabilities supporting connected and automated vehicles have been added to the ITS Architecture software provided and required for use by FHWA. It is recommended that ALDOT update the statewide ITS Architecture with current software ARC-IT, RAD-IT, and SET-IT. The systems engineering process will guide project managers through each of the defined engineering steps. Each of the ALDOT regional TSMO plans that have been prepared provide a basic systems engineering framework recommended for use within that region. It is recommended that ALDOT consider these frameworks and prepare high-level TSMO systems engineering guidance based on the type of system being considered: existing system, existing system modification, new system deployment. It is further recommended that a Statewide Configuration Management Plan and an Asset Management Plan be developed and implemented. The implementation of standard configurations and asset management will support consistent, efficient operations and maintenance of systems and allow for greater optimization; realizing added value in existing and new systems throughout the state. In addition, standardization of configurations and asset management will allow systems to be better secured. Table 18: Systems Engineering Systems Engineering Goal 21 Update ITS Architecture with current software ARC-IT, RAD-IT, and SET-IT. A 22 Develop and implement Statewide Configuration Management Plan. S, M, A 23 Develop and implement Statewide Asset Management Plan. S, M, A 24 Provide TSMO deployment systems engineering guidance. S, M, A - Existing System Deployment Process. - Existing System Deployment Modification Process. - New System Deployment Process. S=Safety M=Mobility A=Accountability S, M, A S, M, A S, M, A C=Collaboration I=Innovation 37