AGC San Diego Constructor Special Edition 2017 Build San Diego Awards Special Edition - 2017 Build San Diego Awards | Page 20
BUILDING CONSTRUCTION
PROJECT: The REY
CONTRACTOR: Swinerton Builders
OWNER: Wood Partners
ARCHITECT: CCBG
PROJECT DESCRIPTION: The REY consists of 478 units in 21 residential stories
located in Cortez Hill, and it includes an eight-level parking structure for
over 60 cars. Unit layout efficiency was a high priority during design
and construction to achieve the overall density of the residential living units. Some of the
amenities include a stunning exterior façade; community gym and pool; outdoor BBQ;
seating areas covered with green roof canopies; an iconic water feature; and a green-
screen system. The western street frontage on 8th Avenue is designated a “green street”
in the Downtown Community Plan, as it is double loaded with two rows of trees and
upgraded sidewalk finishes.
BUILDING CONSTRUCTION
20
PROJECT: Cross Border Xpress
CONTRACTOR: Turner Construction Company
OWNER: Otay-Tijuana Venture, LLC
ARCHITECT: Stantec Architecture, Inc.
PROJECT DESCRIPTION: This 60,300 square foot two-story, steel structure links Tijuana
International Airport with a U.S. Customs Processing Facility in Otay Mesa, via an enclosed
400 feet long pedestrian walkway. It is a fully functional, international transportation
terminal housing in-bound and out-bound customs booths, meeting areas, maintenance
areas, check-in area, shops, restaurants, and parking. It includes U.S. Customs and Border
Patrol Operations, and it is the only privately-financed border crossing between the U.S.
and Mexico. This visionary project is the only one of its kind in the world, and over 2,300
passengers use it daily.
AGC BUILD SAN DIEGO AWARDS - 2017