ACG 5647 help A Guide to career/Snaptutorial ACG 5647 help A Guide to career/Snaptutorial | Page 8
Required:
Create a data flow diagram of the current system.
Create a system flowchart of the existing system.
Identify the internal control weaknesses in the system. Use the six
categories of physical control activities specified in COSO for your
analysis.
Prepare a system flowchart of a redesigned computer based system
that resolves the control weaknesses that you identified in ācā above.
==================================================
ACG 5647 Week 9 Individual Work
For more classes visit
www.snaptutorial.com