The new president of the Wernecke Company was stumped. Why
had profits gone down? He had directed the sales department to
push the product with the highest contribution margin, and the sales
department had come through with flying colors. The percent of
flams sold had increased from 25% of units sold to 37.5% of units
sold. So what happened?
Required:
1. Calculate the Wernecke Company’s estimated direct labor hours
to produce flims and flams.
2. Calculate the predetermined variable overhead rate that will be
used in the coming year using a traditional costing system based
upon direct labor hours.
3. Using a traditional costing system based upon direct labor hours,
compute the unit product costs for flims and flams as well as
contribution margin per unit.
4. It has been suggested to the president to consider the use of an
ABC costing system to allocate manufacturing overhead.
Engineering studies have revealed the following information about
estimated manufacturing activities for the coming year.
Calculate the separate predetermined overhead rates for each of the
activities listed above.