4.
It has been suggested to the president to consider the use of an
ABC costing system to allocate manufacturing overhead. Engineering
studies have revealed the following information about estimated
manufacturing activities for the coming year.
Calculate the separate predetermined overhead rates for each of
the activities
listed above.
5.
The following data is available about the activity levels needed
to produce the projected 25,000 units of Flims:
6.
The following data is available about the activity levels needed
to produce the projected 15,000 units of Flams:
Calculate the expected variable overhead to be applied to Flams.
7.
Calculate the total overhead (total for company) that is expected
to be applied to Flims and Flams.
8.
Calculate the projected unit costs and unit contribution margins
for Flims and Flams using ABC costing.
-------------------------------------------------------------------------------