ACC 560 MART Learn by Doing/acc560mart.com ACC 560 MART Learn by Doing/acc560mart.com | Page 18
Initial concept formation
20
Number of project changes
Design
150,000
Square feet
Construction oversight
100
Number of months
(a) Compute the predetermined overhead rate for each activity.
(b) Classify each of these activities as unit-level, batch-level, productlevel, or facility-level.
E4-1
Saddle Inc. has two types of handbags: standard and custom. The
controller has decided to use a plant wide overhead rate based on
direct labor costs. The president has heard of activity-based costing
and wants to see how the results would differ if this system were used.
Two activity cost pools were developed: machining and machine setup.
Presented below is information related to the company's operations.
Direct labor costs
Standard
Custom
$50,000
$100,000
Machine hours
Setup hours
1,000
100
1,000
400