ACC 300 Assignment 7 ACC 300 Assignment 7

Buy here: http://homework.plus/acc-300-assignment-7/ 1. ​Problem 7-1 An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 10.7 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rating of 138 percent. Assume an allowance of 19 percent of job time. Find the standard time for this operation. ​(Do not round intermediate calculations. Round your final answer to 2 decimal places.) 2. ​Problem 7-4 Given these observed times (in minutes) for four elements of a job, determine the observed time (OT) for ​ each element. ​Note: The second element only occurs every other cycle. ​(Round your answers to 2 decimal places.) CYCLE Element 1 2 3 4 5 6 1 4.1 4.0 5.0 4.1 4.1 4.1