Dry
| 194
Construction site
Time is money
Gone are the days when work on an average
building went from 6-9 months and building
materials were dried out by natural ventilation by
the time the building was finished. Nowadays
with modern building techniques construction
work is efficient and fast. This means
dehumidification is required to dry out the
excess moisture in building materials prior to
occupation.
No matter whether it's new construction or
remodeling a Fantech EDP190LR will cut the
drying time of building materials such as
concrete, joint compound and paint to a fraction
of the time it would have taken in the past with
traditional building techniques.
The benefits of dehumidification are many:
• Joint compound dries in hours not days
• Concrete meets manufacturers standard in
half the time
• Correct conditions for storage and installation
of hardwood
• Prevention of mold or mildew growth
Time is money, Fantech EDP190LR gets the job
done quicker.
NEW
1. EPD 190LR / $2,200.Industrial Dehumidifier
120V, 300 cfm, 75 pints at 80OF, 60% RH
Low grain refrigerant system removes more
moisture from the air. Electronic controls for
precise, convenient setup and simple operation.
See page XXX.
fantech