37th_exhibitor_manual_th | Page 43

THE 37th BANGKOK INTERNATIONAL MOTOR SHOW 2016 Please complete the form clearly. Booth No. ……………………………………………. Booth Name …………………………………………. Request Form 4 Electric power for exhibition period Please return this form by February 23, 2016 Item Description Within due date Over due date During construction Units required Total amount no. 10% 30% (Baht) Section A : Equipment and electric power services for standard booth only 1 Standard 100 w spotlight 870 957 1,131 2 100 w spotlight with 50 cm arm 870 957 1,131 3 40 w 1.2 m fluorescent lamp 800 880 1,040 4 60 w downlight 800 880 1,040 5 500 w 220 volt halogen lamp 2,650 2,915 3,445 6 5 amp socket (with 5 amp fuse) 220 volt 50 Hz 1,000 1,100 1,300 Section B : Breaker including electric power charge 7 15 Amp/220W 1 Phase 50 Hz 6,130 6,743 7,969 8 15 Amp/380W 3 Phase 50 Hz 18,380 20,218 23,894 9 30 Amp/220W 1 Phase 50 Hz 11,030 12,133 14,339 10 30 Amp/380W 3 Phase 50 Hz 25,730 28,303 33,449 11 60 Amp/380W 3 Phase 50 Hz 46,550 51,205 60,515 12 100 Amp/380W 3 Phase 50 Hz 71,050 78,155 92,365 Total 7% value added tax Grand total Reservation shall become effective upon full payment of the invoice amount within the date specified in the invoice. The payment shall be made payable to Grand Prix International Public Company Limited; current account no. 075-3-00234-4, Bangkok Bank, Ladplakhao branch. Evidence of payment (a copy of the cheque or pay-in slip) shall be faxed to the attention of Mr. Pansotog Wongsuwan, Grand Prix International Public Company Limited at the number +66 (0) 2971-6462. (Juristic persons making service payment have the duty to deduct a 3% withholding tax of 1,000 Baht up from the service price before value added tax.) Remark: - Submission of the form during February 24 - March 15, 2016 shall result in a fine of 10% above the invoice amount. - Submission of the form during March 16 - 22, 2016 shall result in a fine of 30% above the invoice amount. - Submission of the form later than March 23, 2016 shall result in a fine of 50% above the invoice amount. - If a breaker is required to be moved from the installed location, a service charge of 5,000 Baht/breaker shall be levied. - For 24 hour use of electric power, the price shall be increased by 100%. “24 hours” shall be entered in the “Units required” column. - Cancellation process requires a written notification 7 days prior the construction day. Any overdue submission will result in 30% refund of the amount charged. The Organizer reserves the right to charge 100% of the invoice amount if the cancellation request is subm