SPONSORS & EXHIBITORS 2019
Same
Day Cosmetic
Repairs
HEADING
HEADING
Same
Day
Cosmetic
Repairs
HEADING
HEADING
We
come
to you!
Subheading
if required
subheading
if required
Same
Day
Cosmetic
Repairs
We
come subheading
to you! if required
Subheading
if required
Up2Scratch
We come to you!
image
image
The renewable (electrical) energy transition is
Set-Up
Set-Up
publicised
underway
the ensure
power
We well
assess
the work and
required
on-site, in and
our
We
assess
the
work
required
on-site,
and
ensure
The
renewable
(electrical)
energy
transition
is
sector.
Less
well
known
is
that
a
renewable
repair
technicians
follow
strict
operating
procedures
Set-Up
our
repair
technicians
follow
strict
operating
to well
ensure
a the
safe
and
clean
environment.
Floors
or our in
publicised
and
underway
in and
the
power
(thermal)
energy
transition
is also
underway
We
assess
work
required
on-site,
ensure
procedures
ensure
a safe
and
clean
driveways
are to
covered
plus
we
set
up a
a renewable
small
marquee
the technicians
building
HVAC
sector.
The
combination
of
sector.
Less
well
known
is operating
that
repair
follow
strict
procedures
environment.
Floors
or
driveways
are
covered
over
the
car
to
protect
the
work
area
from
overspray.
to (thermal)
ensure
safe
and clean
environment.
Floors or in
these a two
renewable
energy
systems
energy
transition
is also
underway
plus
we
set covered
up enhances
a small
over
the
car in
to
We
use
state-of-the-art
air marquee
extraction
units
to marquee
meet
driveways
are
plus
we
set
up productivity
a small
significantly
energy
the
building
HVAC
sector.
The
combination
of
environmental
and
emission
standards.
protect
the
work
area
from
overspray.
We
use
over
the
car
to
protect
the
work
area
from
overspray.
terms two
of overall
efficiency
as systems
well as carbon
these
renewable
energy
state-of-the-art
air air
extraction
units
We
use state-of-the-art
extraction
units to to meet
meet in
emissions
per
productive
unit.
significantly
enhances
energy
productivity
Mobile
Workshops
environmental
emission
standards.
environmental
and and
emission
standards.
terms
of overall
as
well
carbon
Our
top-grade
paints efficiency
are HVAC
approved
by all as
major
car
Where
traditional
systems
use
the
Mobile
Workshops
emissions
per
productive
unit.
manufacturers
which
ensures
we
don’t
jeopardise
ambient
air or burn fossil fuels to provide new
Mobile
Workshops
vehicle
warranties
plus,
they’re
kept
Our
top-grade
paints
are renewable
approved
by
all the
major
Our
top-grade
are HVAC
approved
by in all thermostatically
major
car
heating
or paints
cooling,
the
thermal
Where
traditional
systems
use
controlled
storage
units
on-board
our
mobile
workshops.
car
manufacturers
which
ensures
we
don’t
manufacturers which ensures we don’t jeopardise new
To
prevent
paint cross-contamination
use separate
thermal
sources
that are available we
within
the
spray
guns for
primer,
colour and top lacquer.
built
environment.
To
prevent
paint
cross-contamination
we We
use don’t
To
prevent
paint
cross-contamination
we
use
separate
thermal
sources
that
are
available
within
use
aerosol
paints!
Separate
equipment
is
used
for
separate
spray
guns for primer,
colour
and the
top
The environment.
term
Geoexchange
(heat
exchange
with
spray
guns
for
primer,
colour
and
top
lacquer.
We
don’t
working
on
aluminium
and
steel
car
bodies.
built
lacquer.
We don’t
use aerosol
paints!
Separate
the aerosol
ground)
is commonly
applied
to is
this
thermal
use
paints!
Separate
equipment
used
for
equipment
is used for working
on aluminium
and
The & term
Geoexchange
(heat
with
potential
as
the
ground,
via a Ground
Care
Consideration
working
on approach
aluminium
and
steel
car exchange
bodies.
steel
car
bodies.
the
ground)
commonly
applied
to cured
this using
thermal
Each
stage
of is the
paint
process
is to
fully
Heat
Exchanger
(GHX),
tends
provide
the
potential
approach
ground,
via a Ground
Care
Consideration
infra-red
lamps
before
the the
next
coat of
is applied.
Once the
Care
& & Consideration
thermal
potential
in as
the
majority
applications.
completed
repair
has
cooled
to
ambient
temperature,
Each
stage
of
the
paint
process
is
fully
cured
using
Heat
Exchanger
(GHX),
tends
to
provide
the
Additional
options
include
aquifers,
Each
stage of
the paint
process
is fully surface
cured
the
surface
is sanded
and
its final
polish.
infra-red
lamps
before
the given
next
coat
is applied.
Once the
thermal
potential
in
the
majority
of
applications.
water
bodies
and
infrastructure
such
as is This
using infra-red lamps before the next
coat
process
can
take
up
to
2-3
hours
depending
on the
completed
repair
has
cooled
to
ambient
temperature,
Additional
options
include
aquifers,
surface
subways,
water,
sewer,
building
foundations
applied.
Once
the
completed
repair
has
cooled to
damage.
We is ask
all customer
to its
approve
and This
the
surface
sanded
and given
final
polish.
water
bodies
and
infrastructure
such
as and
and
even
other
buildings.
Thermal
storage
is ask for
ambient
temperature,
the
surface
is
sanded
sign-off on
repair
before
finalisation.
We also
process
can the
take
up to
2-3 hours
depending
on the
subways,
water,
sewer,
building
foundations
given
its final to polish.
This
process
can
take up to
also possible
in all
many
applications,
further
testimonials
our
quality
of
workmanship.
damage.
We ask endorse
customer
to approve
and
2-3
hours
depending
on the Thermal
damage.
We ask is
all
and
even
other
buildings.
storage
optimising
system
performance
through
sign-off on the repair before finalisation. We also ask for
customer
to
approve
and
sign-off
on
the
repair
also
possible
in
many
applications,
further
controlled time
of use. our quality of workmanship.
Experienced
Team
testimonials
to
endorse
before
finalisation.
We
also
ask
for through
testimonials
optimising
system
performance
Our accredited
technicians
are
required
to have a to
Ambient
air
is
still
considered
in
relatively
mild
endorse
quality
of workmanship.
minimum our
of time
5
years’
body
shop experience and are
controlled
of
use.
Experienced
Team
climates
or seasons centre.
and as
part
of a hybrid
trained
in our training
To required
maintain to our
standards
Our
accredited
technicians are
have
a
Experienced
Team
system.
However,
fossil
fuel
combustion
would
Ambient
air
is
still
considered
in
relatively
mild
of
repair,
our
technicians
follow
strict
minimum of 5 years’ body shop experience and are
be rare.
The
key
is to
identify
the
optimal
climates
or seasons
and
part
of
a our
hybrid
Our
accredited
technicians
are
required
to
have
procedures
are
set
out as
in
our
Training
and
trained
in our which
training
centre.
To
maintain
standards
a of
minimum
of
5
years’
body
shop
experience
and
combination
of
thermal
potential
sources
for
a
system.
However,
fossil
fuel
combustion
would
Operations
carried
in strict
each vehicle.
repair, our Handbook
technicians
follow
are
trained
in key
our
training
centre.
To
maintain
given
building
at are
a given
location
and
climate.
be
rare.
The
is
to
the Training
optimal
procedures
which
set identify
out
in our
and our
standards
of
repair,
our
technicians
follow
strict
combination
of
thermal
potential
sources
for a
Operations
carried
in each
vehicle.
Then, an Handbook
integrated
approach
using
optimised
procedures
which
are
set
out
in
our
Training
and
given building at a given location and climate.
Operations Handbook carried in each vehicle.
Then, an integrated approach using optimised
energy approach
the to multitude
ambient
air or burn considers
fossil fuels
provide of
jeopardise
new plus,
vehicle
warranties
plus, they’re
vehicle
warranties
they’re
kept
in
thermostatically
heating or cooling, the renewable thermal
kept in thermostatically
controlled
storage
units
controlled
storage units on-board
our mobile
workshops.
energy approach
considers
the multitude of
on-board
our mobile
workshops.
logo
logo
SCRATCH & DENT RAPID MOBILE REPAIRS.
WE COME & TO DENT
YOU! RAPID MOBILE REPAIRS.
SCRATCH
WE COME TO YOU!
advert 210mm x 78mm
1800 10 10 66
advert 210mm x 78mm
[email protected]
Door 2, 72-92 Station Street, Nunawading VIC
1800 10 10 66
up2scratch.com.au
[email protected]
Door 2, 72-92 Station Street, Nunawading VIC
up2scratch.com.au